For personal use only
First gas and water production from Orana (eastern area) Q4 On Track Talinga pipeline compression station mechanical completion Q4 Accomplished Orana Train 1 mechanical completion Q1 FY15 On Track For personal use only Reedy Creek Train 1 mechanical completion Q1 FY15 On Track

Ambient Air Quality in the Surat Basin
gas wells and gathering networks. Gas field stations have between 15 and 25 wells within a 2 km radius. These stations Talinga, Orana) and one sampler was deployed within 50 m of a Condamine River methane seep. Ambient Air Quality in the Surat Basin 10 . Selection of pollutants .

CC&E Talinga Gas Plant
Talinga Gas plant . Project engineering services were provided Origin's team delivering the Talinga Gas Plant in remote Queensland. This was Origin's largest Coal Seam Gas treatment, compression and export plant prior to LNG development (as a part of APLNG).

Origin APLNG Operational Review weSRCH
Origin APLNG Operational Review and Asset Visit David Baldwin, Chief Executive Officer LNG 29 & 30 May 2014 Important Notice Forward looking statements This presentation contains forward looking statements, including statements of current intention, statements

Australia Pacific LNG Project
• Gas fields • Gas pipeline • LNG facility. This chapter describes the construction, operational and decommissioning phases involved in developing the gas fields element of the Australia Pacific LNG Project (the Project).

Australia Pacific LNG Project
Gas from the GPFs of the Talinga/Orana/Kainama gas field feed gas to the existing DDPS Pipeline. Table 2.3 Pipeline Approx km End points DDPS Condabri Link 5 km Carries gas from the DDPS Pipeline west of the Talinga Metering Station to the Condabri South Lateral at the Condabri Gas Fields Australia Pacific LNG Project EIS Page 8 March

Adam Brady Financial Analyst Origin Energy LinkedIn
The Talinga gas plant sits within the Talinga gas fields and the project comprises 111 operating CSG wells, 120 km of water and gas gathering pipelines, a 20 ML/day reverse osmosis water treatment

Amos Chew Senior Project Manager Western Downs Civil
Part of the well established team at Australia Pacific LNG Project installing the gas gathering systems associated with approximately 600 CSG wells in the Condabri, Talinga / Orana, and Reedy

More than a contractor by LCPL Leighton Contractors
Leighton Contractors was awarded a $63 million contract by Diamantina Power Station Pty Limited (DPS), a company jointly owned by APA Group and AGL

1.2.3.2.1 Coal seam gas projects under construction
Phase 1, which covers the initial five years of the project, focuses on the gas fields Talinga Orana, Condabri, and Combabula in the Maranoa Balonne Condamine subregion. During Phase 1, a total of 1100 production wells are expected to be drilled (Origin Energy, 2013). By March 2014, APLNG had drilled 680 Phase 1 development wells, of which 600

Talinga Queensland Industrial Cladding
Gas produced at the Talinga plant supplies Queensland commercial clients,and power stations that use gas to produce electricity. The Talinga gas plant entire development comprises 111 operating CSG wells, 120 km of water and gas gathering pipelines, 20 ML/day reverse osmosis water treatment facility and a gas processing plant with 17

Use of historicalUse of historical soils informationsoils
Use of historicalUse of historical soils informationsoils information for soil assessment and management planning for CSG projects Cameron Traill 1, • Transported via a gathering network WorleyParsons, 2012.Dispersive texture contrastsoil in Talinga‐Orana gas

Darling Downs Pipeline Jemena
The DDP consists of three interconnected gas transmission pipeline licences in the Darling Downs region in South East Queensland that operate as a single pipeline network. It links the Wallumbilla gas hub near Roma with the Talinga gas plant near Chinchilla and Origin’s Darling Downs gas fired power station near Dalby in Queensland.

Matt Playsted Area Superintendent Denison Gas LinkedIn
View Matt Playsted’s profile on LinkedIn, the world's largest professional community. Three Water Gathering Stations. One water treatment facility 40 ML. Gas reserves proving at Talinga

Andrew Hudson Senior Electrical Designer Mayfield
Origin Talinga Orana Gas Gathering Station January 2019 Present. Switchboard and Motor Control Centre Design and Construction. Tom Price Electrical Infrastructure Replacement August 2018 Present. Switchboard and Motor Control Centre Design and Construction. Gruyere Gold February 2018

Talinga gas plant 120 TJ per day, with potential expansion to 140 TJ/day Orana gas plant with 195 TJ/day. Potential Talinga plant expansion Talinga North plant, if approved, 100TJ/day The Combabula and Reedy Creek gas plants are located north east of Roma. The gas fields are part of the development to be sanctioned when the Train 2 FID decision

Power Jobs in Kogan QLD 4406 SEEK
Find your ideal job at SEEK with 14 power jobs found in Kogan QLD 4406. View all our power vacancies now with new jobs added daily!

Energy australia Jobs in Chinchilla QLD 4413 SEEK
Join Origin's Asset Services team based in the field as part of the Talinga Orana Gas Gathering Station project team. Save. Site Scheduler Listed five days ago 5d ago at Origin. This is a . Full Time job